Project Owner: Crook County
Contract type: Emergency
Project Description: Replaced a washed out culvert with a modular, low-profile concrete bridge system.

Project Features:
Bridge is 21’ long with a 16’ clear span and 40’ width.

Special Features:
Our product was chosen for it’s low pro¬file design and the (ABC) Accelerated Bridge Construction technology. There were two utility conduits cast into the curb panel to accept existing utilities. Guardrail inserts were cast into the curb panels to accept guardrail posts. The complete bridge system was installed in just a few days and the road was re¬opened after a flood had wreaked havoc on the existing culvert.